Home / Services / Bathroom Remodeling

Bathroom Remodeling in the East Bay

Bathrooms built to last — starting with what goes behind the tile.

Remodeled walk-in shower with dark stone tile and a glass enclosure, bathroom remodeling in the East Bay
Bathroom Remodeling by NorCal Construction — CSLB licence #959458.

A bathroom is the smallest room in the house and the one most likely to cost you money later. Almost every failed bathroom we are called in to fix failed for the same reason: the waterproofing behind the tile was done cheaply, or not at all.

Our bathroom remodeling work is organised around that. Tile selection is the fun part and we will happily spend an afternoon on it — but the part that decides whether you are doing this again in eight years is the membrane, the slope of the pan and the ventilation. That is where we do not cut corners, and it is not where the cost savings are anyway.

What a Bathroom Remodel Includes

A full bathroom remodel takes the room to the studs. That is the only way to see the condition of the framing, the supply lines and the subfloor — and in houses of a certain age, that is exactly where the problems are.

What Bathroom Remodeling Costs Around Here

Bathrooms are small, so the cost per square foot looks alarming — but the totals are far more manageable than a kitchen. The ranges below reflect completed projects in the East Bay and North Bay, and are market ranges for planning rather than a quote.

Project scopeWhat it coversTypical range
Guest / hall bath refreshNew vanity, toilet, fixtures, tile floor. Existing layout and tub.$14,000 – $25,000
Full hall bath remodelTo the studs, new waterproofing, tiled shower, new fixtures and ventilation.$28,000 – $45,000
Tub-to-shower conversionTub removed, pan rebuilt, full-height tile, frameless glass.$18,000 – $35,000
Primary suite bathLarger footprint, double vanity, custom shower, heated floor, separate WC.$45,000 – $90,000 +

Market ranges for planning, not a quote. Your estimate depends on scope, materials and site conditions. Get a written line-item estimate.

Tub-to-Shower Conversions

This is our single most requested bathroom job, and for good reason. In most homes the second tub is used twice a year, and the space it occupies is better spent on a shower you can actually move in.

A straight swap — tub out, shower in, same footprint — is the simplest version. We remove the tub, rebuild and re-waterproof the walls, form a new pan with proper slope to the drain, and install the enclosure. Where the floor framing allows, we can drop the pan to make the shower curbless, which looks better and matters enormously if anyone in the house will eventually have mobility issues.

One honest caveat: if your house has only one bathroom, think hard before removing the only tub. It affects resale for families with young children. In a two-bathroom house it is almost always the right call.

Waterproofing: The Part You Never See

Tile is not waterproof. Grout is not waterproof. Cement board is not waterproof. Water goes through all three, and what stops it reaching your framing is the membrane system behind them.

We use a full bonded membrane over the walls and pan, with the corners and the drain flange properly treated — those two points are where nearly every leak begins. The pan is sloped a quarter inch per foot to the drain before the tile goes down, not after, and we flood-test before tiling.

It adds a day or two and a few hundred dollars in material. It is the difference between a shower that lasts twenty-five years and one that quietly rots a joist for eight.

How Long a Bathroom Remodel Takes

Bathrooms run shorter than kitchens but have more sequential steps — waterproofing has to cure, tile has to set, grout has to cure. Compressing that schedule is exactly how bathrooms fail.

PhaseTypical duration
Design and material selection1 – 3 weeks
Permit review (if required)2 – 6 weeks, varies by city
Demolition and rough-in4 – 7 days
Inspection, waterproofing, cure3 – 5 days
Tile, grout and cure5 – 10 days
Fixtures, glass and punch list3 – 6 days
Typical time on site3 – 6 weeks

Ventilation and Mould

Bay Area bathrooms have a specific problem: mild, damp winters and houses that were built tight-ish but ventilated badly. An undersized fan, or one that vents into the attic instead of outside, will grow mould behind your new tile no matter how good the waterproofing is.

We size the exhaust fan to the room, duct it to the exterior in insulated duct, and where it makes sense fit a humidity-sensing switch so it runs until the room is actually dry rather than for the three minutes someone remembered to leave it on.

Ageing in Place

A meaningful share of our bathroom work is for homeowners who intend to stay in the house. Done at remodel time, accessibility costs very little. Retrofitted later, it costs a great deal.

Questions we get asked

Bathroom Remodeling — Frequently Asked Questions

A guest bath refresh runs roughly $14,000–$25,000. A full hall bath taken to the studs with a tiled shower typically lands between $28,000 and $45,000. A primary suite with a custom shower and double vanity generally starts around $45,000.

Three to six weeks on site for a standard bathroom, five to eight for a primary suite. Much of that is waiting — waterproofing and grout have to cure properly, and rushing those two steps is what causes failures.

Yes, it is one of our most common jobs. We rebuild the pan with proper slope, re-waterproof the walls to full height and fit the enclosure. Where the floor framing allows, we can make it curbless.

If the layout and plumbing locations stay put and you are swapping fixtures, often not. Moving the toilet or shower drain, adding circuits, or changing the window or exhaust routing does require one. We handle it either way.

Waterproofing, nearly every time — specifically the corners and the drain flange. A close second is ventilation: an undersized fan or one ducted into the attic will grow mould behind perfectly good tile.

Yes. Curbless shower, blocking for grab bars, comfort-height fixtures, a wider door and slip-resistant tile. Done during the remodel it adds very little; retrofitted later it means opening the walls again.

Other services

We Also Build

Remodeled kitchen with dark cabinetry and a lit marble backsplash, kitchen remodeling by NorCal Construction

Kitchen Remodeling

Custom cabinetry, counters, islands and full layout changes, including moving plumbing and electrical where the layout calls for it.

New home addition with grey siding and tall windows, built by NorCal Construction

Home Additions

Room additions, second storeys and bump-outs — engineered and framed to match the existing house instead of looking bolted on.

Garage conversion in progress with new white shaker cabinets and finished walls

Garage Conversions

Turn an under-used garage into a legal bedroom, office, gym or income-producing studio — permitted, insulated and finished.

Detached backyard ADU with board-and-batten siding and glass doors, East Bay ADU construction

ADU Construction

Detached, attached and junior ADUs — design, permits and build, whether it is for rental income or family.

Brick two-storey home with a covered front porch after a whole-home renovation

Whole-Home Renovations

Full-house renovations — systems, structure and finishes handled under one contract and one schedule.

Thinking about bathroom remodeling?

Send us the details and we will come out, measure and put a written line-item estimate in your hands.